back home A2 Świecko - Konin | Every kilometer matters
Back

Road Surface Renovation at Poznań Wschód Interchange – Traffic Changes from August 23

On Saturday, August 23, the second stage of road surface renovation will begin at the Poznań Wschód motorway interchange, where the A2 motorway meets the S5 expressway towards Bydgoszcz. During this stage, all exit ramps from the A2 to the S5 will be closed – both from the Warsaw and Świecko directions.

Detours will be provided according to the approved temporary traffic management plan. Autostrada Wielkopolska SA urges drivers to drive carefully and pay close attention to road signs.
Detours for drivers
• From Warsaw towards Bydgoszcz/Gniezno – via the Września interchange, national road DK92 to the Kostrzyn interchange.

mapa objazd wezel WSCHOD ZJAZDY v1 WAR GNIE 300x300
• From Warsaw towards Kleszczewo – via the Września interchange, DK92 to Kostrzyn, and then to Kleszczewo.

mapa objazd wezel WSCHOD ZJAZDY v1 WAR KLE 300x300
• From Świecko towards Bydgoszcz/Gniezno – via the Poznań Krzesiny interchange, through Poznań, DK92 to the Kostrzyn interchange.

mapa objazd wezel WSCHOD ZJAZDY v1 SWI GNIE 300x300
• From Świecko towards Kleszczewo – same route: Poznań Krzesiny interchange – Poznań – DK92 – Kostrzyn – Kleszczewo.

mapa objazd wezel WSCHOD ZJAZDY v1 SWI KLE 300x300
Changes on the main motorway carriageway

Between km 177 and 180 of the A2, all traffic will be shifted to the northbound carriageway, where two lanes in each direction will be available.

www 2G 177500 300x142

www 2G 180100 300x99
• Heavy vehicles will not be allowed to use the left lanes.
• The emergency lane will be closed.
• A speed limit of 60 km/h will be in force.

Important for drivers coming from Świecko

The toll-free section of the A2 (Poznań Motorway Bypass) ends at the Poznań Krzesiny interchange. This is the last exit without tolls. The next exit towards Warsaw is at the Września interchange, which means drivers will need to pay at the Nagradowice Toll Plaza.

Work schedule

The renovation of the Poznań East interchange has been divided into stages to minimize inconvenience:
• Stage I – entrance ramps renovation, completed in May 2025.
• Stage II – from August 23, exit ramps will be closed for modernization. Works are expected to take around two weeks, depending on weather conditions.

Where to check updates

Current traffic information on the concession section of the A2 Konin – Świecko is available at:
• X (Twitter): @AutostradaWlkp
• Website: www.autostrada-a2.pl/aktualna-sytuacja
• Infoline: +48 800 022 242