back home A2 Świecko - Konin | Every kilometer matters
Back

Rehabilitation of pavement at the Lądek Toll Plaza

On 16 August this year pavement rehabilitation is scheduled to start in the area of the Lądek TP (235 +500 km of A2). Due to the works, oversized vehicles will not be allowed to pass through the edge lanes between 16 and 20 of August. Drivers are asked to exercise caution and follow the temporary traffic organization signs.

Rehabilitation to the pavement at the Lądek Toll Plaza require the temporary closure of individual lanes to users. In order to minimize the inconvenience caused by the works, they has been divided into sections, for each direction separately, so that to allow most vehicles to pass through the TP.

However, oversized vehicles more than 2.5 meters wide are an exception. In the period from 16 to 20 August, they will not be allowed to drive in the A2 Motorway section between the Września and Modła (Konin) interchanges, in both directions. For other vehicles, passage will be possible using the designated lanes.

The contractor was obliged by the Company to perform the repair work in a timely manner and in a way minimizing the inconvenience to motorists. However, please take into account that weather conditions, strong wind, rainfall, etc., may affect the time of completion of the works.

The performance of rehabilitation works in the area of the Lądek TP was provided for in the long term rehabilitation and investment plan of Autostrada Wielkopolska and results from care to maintain a high standard of the pavement and ensure the comfort and safety of drivers. Heavy vehicles for a large part of the traffic using the concession section, naturally contributing to increased wear and tear on the pavement and the need for rehabilitation.