Rehabilitation of pavement at Poznań Wschód interchange
On 17 May, the first stage of pavement rehabilitation will begin at the Poznań Wschód interchange at the intersection of…
Read moreAfter completion of work on the motorway entry roads within the Poznań Zachód interchange, the works will be performed on the motorway exit roads. As a result exit ramps will be closed to traffic. Diversions will be available for motorists traveling on the motorway and wishing to exit onto the S5 or S11 expressways.
Once the works are moved to the exit roads, the majority of the entry ramps rehabilitated in Stage I will be opened to traffic. Drivers will be able to enter A2 motorway from S5 and S11 expressways at the Poznań Zachód interchange starting from 20 August this year. Please note that a diversion through the Komorniki interchange will be set for drivers traveling toward Świecko from S5 and S11 expressways:
The works on the exit ramps from the motorway are estimated to be completed in about two weeks. However, please note that the pace of work and the completion date depend largely on favorable weather conditions. Rainfall, hail or other weather conditions may delay the works.
In parallel with the rehabilitation of the Poznań Zachód interchange, the General Directorate of National Roads and Motorways in Poznań is performing rehabilitation of the wearing course of the pavement of the ramps managed by it in the area of the aforementioned interchange on the S11 expressway. The scope of work performed by both Autostrada Wielkopolska and the General Directorate for National Roads and Motorways has been planned to avoid additional closure of sections of ramps to vehicle traffic.
The rehabilitation works on the Poznań Zachód interchange was planned in the long term investment and rehabilitation plan of the Autostrada Wielkopolska and consists in replacing the wearing course of the pavement. The works will help maintain high quality road infrastructure and travel comfort, and most importantly, driver safety. The method of performing rehabilitation works on the Poznań Zachód interchange was carefully planned and agreed upon with the Poznań Municipal Office, the Municipal Roads Administration in Poznań, the Wielkopolskie Provincial Roads Administration and the Police, and finally approved by the Poznań branch of the General Directorate of National Roads and Motorways.