{"id":9008,"date":"2026-09-02T08:32:41","date_gmt":"2026-09-02T08:32:41","guid":{"rendered":"https:\/\/www.autostrada-a2.pl\/?p=9008"},"modified":"2026-09-04T12:32:40","modified_gmt":"2026-09-04T12:32:40","slug":"road-surface-repairs-at-the-intersection-of-poznanska-street-and-g-daimler-street-in-komorniki","status":"publish","type":"post","link":"https:\/\/www.autostrada-a2.pl\/en\/news\/road-surface-repairs-at-the-intersection-of-poznanska-street-and-g-daimler-street-in-komorniki\/","title":{"rendered":"Road Surface Repairs at the Intersection of Pozna\u0144ska Street and G. Daimler Street in Komorniki"},"content":{"rendered":"<h3>September 3, 2026, road infrastructure repairs in the area of the Pozna\u0144-Komorniki interchange (km 159 of the A2) are scheduled to be completed. These repairs include the motorway ramps and sections of G\u0142ogowska Street. Immediately after the completion of this phase, the contractor will proceed with the next phase of work, which includes resurfacing Pozna\u0144ska Street in the area of the intersection with Daimlera Street and Magazynowa Street in Komorniki.<\/h3>\n<p>These activities are a continuation of the infrastructure modernization program in the immediate vicinity of the Pozna\u0144 Komorniki interchange and are intended to ensure a consistent, high standard of pavement throughout the entire transportation network.<\/p>\n<p>As with the recently completed renovation of the Pozna\u0144 Komorniki interchange, the scope of work will include replacing the wearing course on sections of Pozna\u0144ska Street, along with reinforcing the pavement. The work will be carried out in phases to minimize disruption to drivers. Temporary traffic control measures, including designated detours, will be implemented during each phase.<\/p>\n<p>In the first phase, work will be carried out on the fast lanes of both directions of Pozna\u0144ska Street.<\/p>\n<p>At the intersection, it will not be possible to turn left or proceed straight through the intersection from Magazynowa and Daimlera Streets.<br \/>\nFor vehicles traveling from Pozna\u0144ska Street toward Magazynowa Street, a detour will be established via the intersection with Nowa\/Nizinna Streets, then along Warsztatowa Street to Magazynowa Street (map 5)<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-8972\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_5-300x300.jpg\" alt=\"AWSA objazd wezel komorniki mapa 5 300x300\" width=\"569\" height=\"569\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_5-300x300.jpg 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_5-1024x1024.jpg 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_5-150x150.jpg 150w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_5-768x768.jpg 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_5.jpg 1201w\" sizes=\"auto, (max-width: 569px) 100vw, 569px\" \/><br \/>\nAccess to Daimlera Street from Pozna\u0144ska Street for vehicles coming from the direction of Komorniki will be routed via the intersection with Kowalewicka Street (map 6)<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-8974\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_6-300x300.jpg\" alt=\"AWSA objazd wezel komorniki mapa 6 300x300\" width=\"521\" height=\"521\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_6-300x300.jpg 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_6-1024x1024.jpg 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_6-150x150.jpg 150w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_6-768x768.jpg 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_6.jpg 1201w\" sizes=\"auto, (max-width: 521px) 100vw, 521px\" \/><br \/>\nFor vehicles entering Pozna\u0144ska Street from Magazynowa Street toward the center of Pozna\u0144 and the Pozna\u0144 Komorniki interchange, a detour will be established via Warsztatowa Street and Nizinna Street. (map 7)<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-8976\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_7-300x300.jpg\" alt=\"AWSA objazd wezel komorniki mapa 7 300x300\" width=\"519\" height=\"519\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_7-300x300.jpg 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_7-1024x1024.jpg 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_7-150x150.jpg 150w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_7-768x768.jpg 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_7.jpg 1201w\" sizes=\"auto, (max-width: 519px) 100vw, 519px\" \/><br \/>\nThe detour for vehicles exiting Daimlera Street toward downtown Pozna\u0144 and the Pozna\u0144 Komorniki interchange will be routed via Wi\u015bniowa Street, Wawrzyniaka Street, and Kolumba Street in Komorniki, as well as the G\u0142uch\u00f3w and Chom\u0119cice bypasses to the Konarzewo interchange. (map 8)<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-8978\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_8-300x155.jpg\" alt=\"AWSA objazd wezel komorniki mapa 8 300x155\" width=\"515\" height=\"266\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_8-300x155.jpg 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_8-1024x528.jpg 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_8-768x396.jpg 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_8-1536x791.jpg 1536w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_8-2048x1055.jpg 2048w\" sizes=\"auto, (max-width: 515px) 100vw, 515px\" \/><br \/>\nA speed limit of 50 km\/h will be in effect within the work zone. Bus stops will be relocated outside the work zone.<\/p>\n<p>In the next phase, work will continue on the left (fast) lanes on the north side of the intersection. At the same time, road crews will begin renovating the entire width of the roadway beyond the intersection toward Komorniki and at the intersection itself.<\/p>\n<ul>\n<li>It will still not be possible to turn left or proceed straight through the intersection from Magazynowa Street and Daimler Street.<br \/>\nDetours will remain unchanged. The only difference is that on the south side of the intersection, toward Komornik, traffic will use a single lane in both directions.<\/li>\n<li>A speed limit of 50 km\/h will be enforced within the construction zone.<\/li>\n<\/ul>\n<p>In the final stage, the renovation will cover the right (slow) lanes of Pozna\u0144ska Street in both directions. During the work, the entrances from Daimlera Street and Magazynowa Street will be closed.<\/p>\n<ul>\n<li>For drivers coming from Pozna\u0144ska Street from the direction of Pozna\u0144 who wish to turn onto Magazynowa Street, a detour will be established via the intersection with Nowa\/Nizinna Streets, Warsztatowa Street, and then on to Magazynowa Street (map 9)<\/li>\n<li><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-8980\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_9-300x300.jpg\" alt=\"AWSA objazd wezel komorniki mapa 9 300x300\" width=\"553\" height=\"553\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_9-300x300.jpg 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_9-1024x1024.jpg 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_9-150x150.jpg 150w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_9-768x768.jpg 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_9.jpg 1200w\" sizes=\"auto, (max-width: 553px) 100vw, 553px\" \/><br \/>\nFor drivers turning from Pozna\u0144ska Street toward Daimlera Street, the detour will follow the A2 highway to the Pozna\u0144 Zach\u00f3d interchange, the S5 expressway to the Konarzewo interchange, and the Chom\u0119cice and G\u0142uch\u00f3w bypasses to Wi\u015bniowa Street and then on to Daimlera Street (map 10).<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-8982\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_10-300x155.jpg\" alt=\"AWSA objazd wezel komorniki mapa 10 300x155\" width=\"550\" height=\"284\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_10-300x155.jpg 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_10-1024x528.jpg 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_10-768x396.jpg 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_10-1536x791.jpg 1536w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_10-2048x1055.jpg 2048w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><\/p>\n<ul>\n<li>For drivers leaving Magazynowa Street toward downtown Pozna\u0144, the detour will run along Warsztatowa Street and Nizinna Street to Pozna\u0144ska Street (map 11)<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-8984\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_11-300x300.jpg\" alt=\"AWSA objazd wezel komorniki mapa 11 300x300\" width=\"557\" height=\"557\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_11-300x300.jpg 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_11-1024x1024.jpg 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_11-150x150.jpg 150w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_11-768x768.jpg 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_11.jpg 1200w\" sizes=\"auto, (max-width: 557px) 100vw, 557px\" \/><\/p>\n<ul>\n<li>For drivers leaving Daimler Street and heading toward downtown Pozna\u0144, the detour will run via Wi\u015bniowa Street, Wawrzyniaka Street, and Kolumba Street in Komorniki, as well as the G\u0142uch\u00f3w and Chom\u0119cice bypasses to the Konarzewo interchange. (map 12)<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-8986\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_12-300x155.jpg\" alt=\"AWSA objazd wezel komorniki mapa 12 300x155\" width=\"555\" height=\"287\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_12-300x155.jpg 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_12-1024x527.jpg 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_12-768x396.jpg 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_12-1536x791.jpg 1536w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/08\/AWSA_objazd_wezel_komorniki_mapa_12-2048x1055.jpg 2048w\" sizes=\"auto, (max-width: 555px) 100vw, 555px\" \/><br \/>\nA speed limit of 50 km\/h will be in effect within the area of the roadwork.<\/p>\n<p>We ask drivers to pay attention, exercise caution, and follow the temporary traffic control signs. This will ensure that the work proceeds smoothly and safely\u2014for both travelers and workers on the road.<\/p>\n<p>The work being carried out is part of a long-term infrastructure maintenance program implemented by Autostrada Wielkopolska. The company consistently carries out pavement repairs based on regular condition assessments, performing them before serious damage occurs. This approach allows the company to maintain a high technical standard of the motorway and the road sections under its management, while ensuring safe and comfortable travel conditions for drivers.<\/p>\n<p>The duration of the above work is estimated at approximately 3 weeks. Please note that the schedule is subject to favorable weather conditions.<\/p>\n<p>You can follow the current situation on the concession section of the A2 motorway, including the Pozna\u0144 highway bypass, in real time at: <a href=\"https:\/\/www.autostrada-a2.pl\/aktualna-sytuacja\/\">https:\/\/www.autostrada-a2.pl\/aktualna-sytuacja\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>September 3, 2026, road infrastructure repairs in the area of the Pozna\u0144-Komorniki interchange (km 159 of the A2) are scheduled to be completed. These repairs include the motorway ramps and sections of G\u0142ogowska Street. Immediately after the completion of this phase, the contractor will proceed with the next phase of work, which includes resurfacing Pozna\u0144ska [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":8990,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[64,28,29],"tags":[],"class_list":["post-9008","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-investments","category-news","category-press-relases"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/posts\/9008","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/comments?post=9008"}],"version-history":[{"count":4,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/posts\/9008\/revisions"}],"predecessor-version":[{"id":9025,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/posts\/9008\/revisions\/9025"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/media\/8990"}],"wp:attachment":[{"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/media?parent=9008"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/categories?post=9008"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/tags?post=9008"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}