{"id":8687,"date":"2026-06-15T08:13:31","date_gmt":"2026-06-15T08:13:31","guid":{"rendered":"https:\/\/www.autostrada-a2.pl\/?p=8687"},"modified":"2026-06-15T08:42:43","modified_gmt":"2026-06-15T08:42:43","slug":"pavement-rehabilitation-works-at-the-poznan-krzesiny-interchange","status":"publish","type":"post","link":"https:\/\/www.autostrada-a2.pl\/en\/news\/pavement-rehabilitation-works-at-the-poznan-krzesiny-interchange\/","title":{"rendered":"Pavement Rehabilitation Works at the Pozna\u0144 Krzesiny Interchange"},"content":{"rendered":"<h2>On 18 June 2026, Autostrada Wielkopolska S.A. will begin pavement rehabilitation works at the Pozna\u0144 Krzesiny motorway interchange (A2 motorway, km 171). The project is part of the concessionaire\u2019s ongoing maintenance programme aimed at preserving a high standard of road infrastructure. The works are intended to maintain pavement quality, thereby enhancing both safety and driving comfort for motorway users.<\/h2>\n<p>The project will involve replacing the wearing course of the pavement within the Pozna\u0144 Krzesiny interchange area. To minimise disruption to traffic, the works have been divided into several stages. Traffic through the interchange will be maintained throughout the construction period.<br \/>\nAs individual stages progress, selected ramps will be temporarily closed. Wherever possible, traffic will be redirected via other ramps within the interchange. If this is not feasible, signed detours will be introduced via the Koninko interchange or local roads in the Pozna\u0144 Krzesiny area.<\/p>\n<p>Drivers are advised to exercise caution, pay close attention to temporary traffic signage and follow all traffic management measures in place. This will help ensure both the safe execution of the works and the safety of all road users.<\/p>\n<p>Preparatory works, including the construction of temporary crossovers between carriageways to facilitate traffic management during subsequent stages, will begin on 18 June. The main pavement rehabilitation works will commence on Monday, 22 June.<\/p>\n<p><strong>Stage 1<\/strong><br \/>\nThe first stage will include works on the following ramps: \u015awiecko \u2013 Katowice, Pozna\u0144 \u2013 \u015awiecko. Roadworks will also be carried out simultaneously on a section of B. Krzywoustego Street, Pozna\u0144, in the direction of Katowice, both immediately before and after the interchange. During this phase:<\/p>\n<ul>\n<li>Traffic travelling from \u015awiecko towards Katowice and from Pozna\u0144 towards \u015awiecko will be diverted via other ramps within the Pozna\u0144 Krzesiny interchange.<\/li>\n<li>Traffic restrictions will apply on B. Krzywoustego Street, Poznan,\u00a0 towards Katowice:<br \/>\n&#8211; On the northern side of the interchange, traffic will be reduced to a single fast lane.<br \/>\n&#8211; On the southern side, traffic will operate in both directions on a single carriageway.<\/li>\n<li>A temporary speed limit of 50 km\/h will be in force.<\/li>\n<\/ul>\n<p><strong>Stage 2<\/strong><br \/>\nWorks on Krzywoustego Street will continue. On the northern side of the interchange, construction activities will move to the fast lane, with traffic maintained solely on the slow lane.<\/p>\n<p><strong>Stage 3<\/strong><br \/>\nConstruction activities will focus on the following ramps: Katowice &#8211; \u015awiecko, Warsaw &#8211; Katowice. During this stage:<\/p>\n<ul>\n<li>Drivers travelling on the A2 motorway from Warsaw and wishing to continue towards Katowice (S11) will be diverted via Krzywoustego Street, Klenowska Street, Kr\u0119glewskiego Street and Tychowskiego Street (near Kinepolis).<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-8671\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_1-300x300.jpg\" alt=\"AWSA objazd wezel krzesiny mapa 1 300x300\" width=\"629\" height=\"629\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_1-300x300.jpg 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_1-1024x1024.jpg 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_1-150x150.jpg 150w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_1-768x768.jpg 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_1.jpg 1202w\" sizes=\"auto, (max-width: 629px) 100vw, 629px\" \/><\/p>\n<ul>\n<li>Drivers travelling on the S11 from Katowice and intending to join the A2 motorway towards \u015awiecko will follow the same detour route.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-8673\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_2-300x300.jpg\" alt=\"AWSA objazd wezel krzesiny mapa 2 300x300\" width=\"663\" height=\"663\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_2-300x300.jpg 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_2-1024x1024.jpg 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_2-150x150.jpg 150w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_2-768x769.jpg 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_2.jpg 1202w\" sizes=\"auto, (max-width: 663px) 100vw, 663px\" \/><\/p>\n<p><strong>Stage 4<\/strong><br \/>\nWorks will continue on the Warsaw &#8211; Katowice ramp, while construction will begin on Pozna\u0144 &#8211; Warsaw ramp and another section of B. Krzywoustego Street, Pozna\u0144, towards Katowice. During this phase:<\/p>\n<ul>\n<li>Traffic on the section of Krzywoustego Street crossing the interchange will operate in both directions on a single carriageway.<\/li>\n<li>A speed limit of 50 km\/h will remain in force.<\/li>\n<li>Drivers travelling from Warsaw towards Katowice (S11) will be diverted via Krzywoustego Street, Klenowska Street, Kr\u0119glewskiego Street and Tychowskiego Street.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-8675\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_3-300x300.jpg\" alt=\"AWSA objazd wezel krzesiny mapa 3 300x300\" width=\"616\" height=\"616\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_3-300x300.jpg 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_3-1024x1024.jpg 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_3-150x150.jpg 150w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_3-768x769.jpg 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_3.jpg 1202w\" sizes=\"auto, (max-width: 616px) 100vw, 616px\" \/><\/p>\n<ul>\n<li>Drivers travelling from Pozna\u0144 and wishing to enter the A2 motorway towards Warsaw will be directed via the Koninko interchange.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-8677\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_4-300x300.jpg\" alt=\"AWSA objazd wezel krzesiny mapa 4 300x300\" width=\"683\" height=\"683\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_4-300x300.jpg 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_4-1024x1024.jpg 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_4-150x150.jpg 150w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_4-768x768.jpg 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_4.jpg 1202w\" sizes=\"auto, (max-width: 683px) 100vw, 683px\" \/><\/p>\n<p><strong>Stage 5<\/strong><br \/>\nWorks will focus on \u015awiecko &#8211; Pozna\u0144 ramp and continued construction on the Pozna\u0144 &#8211; Warsaw ramp. During this stage:<\/p>\n<ul>\n<li>Drivers travelling from \u015awiecko and intending to exit towards Pozna\u0144 will be directed via the Koninko interchange.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-8679\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_5-300x300.jpg\" alt=\"AWSA objazd wezel krzesiny mapa 5 300x300\" width=\"744\" height=\"744\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_5-300x300.jpg 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_5-1024x1024.jpg 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_5-150x150.jpg 150w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_5-768x769.jpg 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_5.jpg 1202w\" sizes=\"auto, (max-width: 744px) 100vw, 744px\" \/><\/p>\n<ul>\n<li>Drivers travelling from Pozna\u0144 and wishing to join the A2 motorway towards Warsaw will also be diverted via the S11 route and the Koninko interchange.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-8681\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_6-300x300.jpg\" alt=\"AWSA objazd wezel krzesiny mapa 6 300x300\" width=\"587\" height=\"587\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_6-300x300.jpg 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_6-1024x1024.jpg 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_6-150x150.jpg 150w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_6-768x768.jpg 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_6.jpg 1202w\" sizes=\"auto, (max-width: 587px) 100vw, 587px\" \/><\/p>\n<p><strong>Stage 6<\/strong><br \/>\nThe next phase will involve works on the eastern carriageway of Krzywoustego Street and on the following ramps: \u015awiecko &#8211; Pozna\u0144 and Warsaw &#8211; Pozna\u0144. During this stage:<\/p>\n<ul>\n<li>Traffic on Krzywoustego Street will operate in both directions on the western carriageway.<\/li>\n<li>A speed limit of 50 km\/h will apply.<\/li>\n<li>Drivers travelling from \u015awiecko towards Pozna\u0144 will be diverted via the S11 route and the Koninko interchange.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-8683\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_7-300x300.jpg\" alt=\"AWSA objazd wezel krzesiny mapa 7 300x300\" width=\"613\" height=\"613\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_7-300x300.jpg 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_7-1024x1024.jpg 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_7-150x150.jpg 150w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_7-768x769.jpg 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2026\/06\/AWSA_objazd_wezel_krzesiny_mapa_7.jpg 1202w\" sizes=\"auto, (max-width: 613px) 100vw, 613px\" \/><\/p>\n<ul>\n<li>Drivers travelling from Warsaw towards Pozna\u0144 will be asked to leave the motorway at the Lubo\u0144 interchange.<\/li>\n<\/ul>\n<p><strong>Final Stage<\/strong><br \/>\nThe last stage of the project will involve rehabilitation works on the Katowice &#8211; Warsaw ramp. Traffic for this relation will be redirected via other ramps within the Pozna\u0144 Krzesiny interchange.<\/p>\n<p><strong>Access to Local Facilities<\/strong><br \/>\nAccess to the Shell service station located near the Pozna\u0144 Krzesiny interchange will be maintained throughout the entire duration of the works.<\/p>\n<p>Drivers are requested to exercise particular caution and follow all temporary traffic management measures introduced to ensure road user safety and facilitate the efficient completion of the project.<\/p>\n<p>The works are expected to be completed approximately five weeks after commencement. However, the schedule remains dependent on weather conditions and may be adjusted in the event of adverse weather.<\/p>\n<p><strong>Traffic Information<\/strong><\/p>\n<p>Current traffic conditions on the A2 motorway section between Konin and \u015awiecko are available at:<br \/>\n<a href=\"https:\/\/www.autostrada-a2.pl\/aktualna-sytuacja\/\">Autostrada Wielkopolska \u2013 Traffic Information<\/a><\/p>\n<p>Motorway users may also contact the information hotline: +48 800 022 242.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On 18 June 2026, Autostrada Wielkopolska S.A. will begin pavement rehabilitation works at the Pozna\u0144 Krzesiny motorway interchange (A2 motorway, km 171). The project is part of the concessionaire\u2019s ongoing maintenance programme aimed at preserving a high standard of road infrastructure. The works are intended to maintain pavement quality, thereby enhancing both safety and driving [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":8685,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[64,28,29],"tags":[],"class_list":["post-8687","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-investments","category-news","category-press-relases"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/posts\/8687","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/comments?post=8687"}],"version-history":[{"count":3,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/posts\/8687\/revisions"}],"predecessor-version":[{"id":8690,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/posts\/8687\/revisions\/8690"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/media\/8685"}],"wp:attachment":[{"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/media?parent=8687"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/categories?post=8687"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/tags?post=8687"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}