{"id":7796,"date":"2025-08-08T09:06:37","date_gmt":"2025-08-08T09:06:37","guid":{"rendered":"https:\/\/www.autostrada-a2.pl\/?p=7796"},"modified":"2025-08-08T09:22:15","modified_gmt":"2025-08-08T09:22:15","slug":"the-opening-of-the-poznan-lubon-junction-postponed-due-to-unfavorable-weather-conditions","status":"publish","type":"post","link":"https:\/\/www.autostrada-a2.pl\/en\/news\/the-opening-of-the-poznan-lubon-junction-postponed-due-to-unfavorable-weather-conditions\/","title":{"rendered":"The opening of the Pozna\u0144 Lubo\u0144 junction postponed due to unfavorable weather conditions"},"content":{"rendered":"<h1>The opening of the Pozna\u0144 Lubo\u0144 junction, planned for this week, will be postponed by approximately 10 days. The reason for the delay is the heavy rainfall in recent days, which has prevented the timely completion of key construction and finishing works.<\/h1>\n<p>The weather conditions in recent weeks have significantly hampered the progress of the works, especially those requiring a dry surface and stable technical parameters. Our priority is to commission a junction that is completely safe and meets all quality standards, which is why it is necessary to postpone the completion date of the investment.<\/p>\n<p>Due to the need to change the work schedule, the opening of the junction slip roads is planned for August 18 and will be implemented gradually. First, the slip roads to the A2 motorway will be opened, both in the direction of Warsaw and \u015awiecko. Next, road builders will open the slip roads from the A2 motorway, both from the direction of \u015awiecko and Warsaw.<\/p>\n<p>After opening the slip roads, road builders will proceed to the second stage of the junction modernization \u2013 renovation of the western road surface of the DW430 road leading from Pozna\u0144 to Lubo\u0144. During this stage, traffic will be redirected to the eastern carriageway and the entrance and exit at D\u0119biecka Street in Lubo\u0144 will be closed. Detours will be routed through the streets of Lubo\u0144. Access to the property at Armii Pozna\u0144 2-2H Street will be possible.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-7720\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.2_Poznan-Lubon-300x72.png\" alt=\"2.2 Poznan Lubon 300x72\" width=\"758\" height=\"182\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.2_Poznan-Lubon-300x72.png 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.2_Poznan-Lubon-1024x246.png 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.2_Poznan-Lubon-768x185.png 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.2_Poznan-Lubon-1536x370.png 1536w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.2_Poznan-Lubon-2048x493.png 2048w\" sizes=\"auto, (max-width: 758px) 100vw, 758px\" \/><\/p>\n<p>Due to the nature and location of the works, traffic lights will be turned off and traffic will be controlled manually. Please drive carefully and follow the temporary traffic signs and instructions of traffic controllers.<\/p>\n<p>Please note that the pace of work and the date of completion depend largely on favorable weather conditions. Additional rainfall, hail, or other weather disturbances may delay the work.<br \/>\nWe apologize for any inconvenience and thank you for your understanding.<\/p>\n<p>Up-to-date traffic information for the A2 section between Konin and \u015awiecko is available at:<br \/>\n\ud83c\udf10 https:\/\/www.autostrada-a2.pl\/aktualna-sytuacja\/<br \/>\n\ud83d\udcde Infoline: +48 800 022 242<br \/>\n\ud83d\udcf1 X (Twitter): https:\/\/x.com\/AutostradaWlkp<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The opening of the Pozna\u0144 Lubo\u0144 junction, planned for this week, will be postponed by approximately 10 days. The reason for the delay is the heavy rainfall in recent days, which has prevented the timely completion of key construction and finishing works. The weather conditions in recent weeks have significantly hampered the progress of the [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":3656,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[63,28,29],"tags":[],"class_list":["post-7796","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-expansion-of-the-3rd-lane","category-news","category-press-relases"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/posts\/7796","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/comments?post=7796"}],"version-history":[{"count":2,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/posts\/7796\/revisions"}],"predecessor-version":[{"id":7798,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/posts\/7796\/revisions\/7798"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/media\/3656"}],"wp:attachment":[{"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/media?parent=7796"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/categories?post=7796"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/tags?post=7796"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}