{"id":7755,"date":"2025-07-30T11:46:57","date_gmt":"2025-07-30T11:46:57","guid":{"rendered":"https:\/\/www.autostrada-a2.pl\/?p=7755"},"modified":"2025-07-17T12:15:28","modified_gmt":"2025-07-17T12:15:28","slug":"closure-of-krzyzowniki-and-tulce-service-areas-from-august-3","status":"publish","type":"post","link":"https:\/\/www.autostrada-a2.pl\/en\/news\/closure-of-krzyzowniki-and-tulce-service-areas-from-august-3\/","title":{"rendered":"Closure of Krzy\u017cowniki and Tulce Service Areas from August 3"},"content":{"rendered":"<h4>Due to the ongoing expansion of the A2 motorway to include a third lane between Pozna\u0144 Krzesiny and Pozna\u0144 Wsch\u00f3d interchange, a new traffic pattern will be introduced on August 3 near the Krzy\u017cowniki and Tulce Service Areas (km 176 A2), which will involve the temporary closure of these Rest and Service Areas (MOPs).<\/h4>\n<p>Starting Saturday, August 2, road crews will begin implementing elements of a new temporary traffic organization near the Krzy\u017cowniki\/Tulce MOPs. Temporary lanes will be marked for vehicles traveling on the motorway, and warning, mandatory, and prohibitory signs related to the construction will be installed.<\/p>\n<p>From August 3, the following traffic organization will be in effect due to the expansion:<br \/>\n\u2022 Between Pozna\u0144 Krzesiny interchange and km 176 A2, traffic will remain fully shifted onto the northern carriageway, which will have four lanes: two in the direction of Warsaw (against the usual flow) and two toward \u015awiecko. Heavy vehicles will be banned from using the left lanes in both directions. The emergency lane will not be available, and a speed limit of 60 km\/h will apply in traffic shift areas.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-7734\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/3.C.1_zblizenie_new-300x143.png\" alt=\"3.C.1 zblizenie new 300x143\" width=\"688\" height=\"328\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/3.C.1_zblizenie_new-300x143.png 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/3.C.1_zblizenie_new-1024x488.png 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/3.C.1_zblizenie_new-768x366.png 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/3.C.1_zblizenie_new-1536x732.png 1536w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/3.C.1_zblizenie_new-2048x976.png 2048w\" sizes=\"auto, (max-width: 688px) 100vw, 688px\" \/><br \/>\n\u2022 The southern carriageway of the motorway will also be closed to traffic between km 176 and 177. Traffic in both directions will continue to use the northern carriageway (as from km 171). Drivers will have two lanes available in each direction\u2014toward \u015awiecko and Warsaw. The emergency lane will remain unavailable, and heavy vehicles will still be prohibited from the left lanes in both directions.<\/p>\n<h4><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-7746\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.F.1-razem-3.C.3-300x74.png\" alt=\"2.F.1 razem 3.C.3 300x74\" width=\"693\" height=\"171\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.F.1-razem-3.C.3-300x74.png 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.F.1-razem-3.C.3-1024x253.png 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.F.1-razem-3.C.3-768x189.png 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.F.1-razem-3.C.3-1536x379.png 1536w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.F.1-razem-3.C.3-2048x505.png 2048w\" sizes=\"auto, (max-width: 693px) 100vw, 693px\" \/><br \/>\n\u2022 At this stage of work, MOP Tulce and MOP Krzy\u017cowniki will be closed. The nearest available service areas are:<\/h4>\n<ul>\n<li>MOP Targowa G\u00f3rka (km 200 A2, southern carriageway) \u2013 for drivers heading toward Warsaw \u2013 no fuel station<\/li>\n<li>MOP Gozdowo (km 216 A2, southern carriageway) \u2013 for drivers heading toward Warsaw \u2013 fuel station and fast food restaurant available<\/li>\n<li>MOP Czerlejno on road S5 \u2013 for drivers exiting the motorway at Pozna\u0144 East interchange toward Bydgoszcz<\/li>\n<li>MOP Dopiewiec (km 151 A2, northern carriageway) \u2013 for drivers heading toward \u015awiecko \u2013 no fuel station<\/li>\n<li>MOP S\u0119dzinko (km 133 A2, northern carriageway) \u2013 for drivers heading toward \u015awiecko \u2013 fuel station available<\/li>\n<\/ul>\n<p>\u2022 Around km 177, traffic heading toward Warsaw will be shifted back to the southern carriageway of the motorway.<\/p>\n<h4><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-7748\" src=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.F.2_zblizenie_new-300x193.png\" alt=\"2.F.2 zblizenie new 300x193\" width=\"685\" height=\"441\" srcset=\"https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.F.2_zblizenie_new-300x193.png 300w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.F.2_zblizenie_new-1024x658.png 1024w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.F.2_zblizenie_new-768x493.png 768w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.F.2_zblizenie_new-1536x986.png 1536w, https:\/\/www.autostrada-a2.pl\/wp-content\/uploads\/2025\/07\/2.F.2_zblizenie_new-2048x1315.png 2048w\" sizes=\"auto, (max-width: 685px) 100vw, 685px\" \/><br \/>\nPlease note: the above schedule is subject to change depending on weather conditions.<\/h4>\n<p>We are making every effort to ensure that the expansion proceeds efficiently, on time, and with minimal disruption to drivers. We recognize that construction work may cause temporary inconvenience and thank you for your understanding and cooperation.<br \/>\nWe also appeal for extra caution and attention in the construction zone. Just beyond the barriers separating traffic from the work zone, it\u2019s not only machines at work\u2014there are people, too. The construction area is carefully designed and secured, and all activities are carried out in line with safety regulations and standards.<\/p>\n<p>Ultimately, safety also depends on driver behavior. So please: Be alert. Slow down. Adjust your speed to the conditions. Follow the signs. Stay extra cautious. Together, we can ensure that road workers can carry out their duties safely.<\/p>\n<p>Up-to-date traffic information for the A2 section between Konin and \u015awiecko is available at:<br \/>\n\ud83c\udf10 <a href=\"https:\/\/www.autostrada-a2.pl\/aktualna-sytuacja\/\">https:\/\/www.autostrada-a2.pl\/aktualna-sytuacja\/<\/a><br \/>\n\ud83d\udcde Infoline: +48 800 022 242<br \/>\n\ud83d\udcf1 X (Twitter): <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/x.com\/AutostradaWlkp\">https:\/\/x.com\/AutostradaWlkp<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Due to the ongoing expansion of the A2 motorway to include a third lane between Pozna\u0144 Krzesiny and Pozna\u0144 Wsch\u00f3d interchange, a new traffic pattern will be introduced on August 3 near the Krzy\u017cowniki and Tulce Service Areas (km 176 A2), which will involve the temporary closure of these Rest and Service Areas (MOPs). Starting [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":7750,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[63,64,28,29],"tags":[],"class_list":["post-7755","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-expansion-of-the-3rd-lane","category-investments","category-news","category-press-relases"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/posts\/7755","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/comments?post=7755"}],"version-history":[{"count":1,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/posts\/7755\/revisions"}],"predecessor-version":[{"id":7756,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/posts\/7755\/revisions\/7756"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/media\/7750"}],"wp:attachment":[{"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/media?parent=7755"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/categories?post=7755"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.autostrada-a2.pl\/en\/wp-json\/wp\/v2\/tags?post=7755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}