The total surface of the concrete pavement is over 2,000,000 m2 = over 3,500 Olympic swimming pools.
Curiosities
-
Concrete pavement
-
Lean concrete
The total surface of lean concrete to be built corresponds to almost 300 football pitches.
-
Embankments
Total embankment volume is over 6 000 000 m3, which makes almost 800 football pitch-size sand pits.
-
Cuts
Total volume of cuts is around 7 000 000 m3 - almost 9 Warsaw Palaces of Culture and Science.
-
Staff
The motorway construction involved:
- more than 2 thousand people employed
- almost 1 thousand pieces of equipment in use