• Concrete pavement

    The total surface of the concrete pavement is over 2,000,000 m2 = over 3,500 Olympic swimming pools.

  • Lean concrete

    The total surface of lean concrete to be built corresponds to almost 300 football pitches.

  • Embankments

    Total embankment volume is over 6 000 000 m3, which makes almost 800 football pitch-size sand pits.

  • Cuts

    Total volume of cuts is around 7 000 000 m3 - almost 9 Warsaw Palaces of Culture and Science.

  • Staff

    The motorway construction involved:

    • more than 2 thousand people employed
    • almost 1 thousand pieces of equipment in use